Review the network level and build a line-by-line BOM.

Project consolidation
FTTH Materials Consolidation and Export Record
A documented workflow for coordinating cable, passive materials, packing lists and shipment evidence.
This record focuses on reducing compatibility and packing gaps when several FTTH materials are purchased in one shipment.
Project control point
A complete FTTH order can fail at site when cable, splitters, boxes, connectors, labels and quantities are confirmed independently.
VERIFIABLE WORKFLOW
خطوات التحكم
Confirm cable, split ratio, box capacity, connectors and installation accessories.
Allocate item codes, carton or drum labels and packing sequence.
Cross-check the packing list and create consolidation/loading evidence.

DOCUMENT CHECK
الأدلة المتاحة
- Approved BOM and item references
- Product and packing labels
- Packing list cross-check
- Consolidation and loading photos
النتيجة
The contractor or distributor receives a clearer material handover file for receiving and site allocation.