Turn the RFQ Into a Production-Ready Order

Jiaxin reviews the requested model against the route and turns the confirmed requirements into a controlled production and inspection file.

01

Drawing and BOM

Confirm cable construction, fibre brand, materials, colour code, printing and tolerance before production.

02

Production checkpoints

Track colouring, tube extrusion, stranding, sheathing and armour steps required by the selected model.

03

Test records

Define attenuation, OTDR, dimensional and mechanical checks and the records required before shipment.

04

Export packing

Confirm drum length, labels, moisture protection, loading plan and destination documents.

Jiaxin procurement checklist

Prepare an OPGW manufacturing specification

An OPGW order needs a utility-approved mechanical and electrical specification, not just a fibre count. Use the model cards to identify a construction family, then send the approved conductor drawing for manufacturing review. The factory quotation does not replace the line designer's approval.

Confirm these requirements before approving production
Order itemInformation to supplyApproval risk
ConstructionUnitube or stranded arrangement, outside diameter and approved drawingDo not select by product name or photograph alone.
Optical packageFibre count, fibre specification, colour code and test acceptance criteriaKeep the optical schedule consistent with the splice plan.
Electrical dutyRequired short-circuit current, duration and initial/final temperature conditionsA current value without its duty conditions is incomplete.
Mechanical dutyRequired strength, installation tension, span/loading data and hardware interfacesThe utility or line designer must confirm the design limits.
Supply scheduleDrum lengths, quantities, identification and destination documentationConfirm joint locations before fixing drum lengths.

From RFQ to approved supply

  1. Submit the utility specification and revision-controlled drawing with the RFQ.
  2. Resolve differences between the requested conductor, optical package and available construction before approval.
  3. Agree the inspection plan and required test records before production starts.
  4. Match drum labels and packing lists to the approved length and identification schedule.

Procurement questions

Can I choose unitube or stranded OPGW from fibre count alone?

No. Fibre count is one input; the approved conductor construction and mechanical and electrical duties also determine suitability. Request a reviewed drawing rather than assuming the two constructions are interchangeable.

Which test reports should be included in an OPGW order?

List the required optical, dimensional, mechanical and electrical evidence in the purchase specification. Confirm which routine records and type-test evidence apply to the agreed design; do not assume every quotation includes every test.

Can hardware be added to the same shipment?

Provide the approved OPGW diameter, hardware drawings and installation interfaces. Confirm compatibility and quantities separately; a general ADSS clamp listing is not proof that a fitting suits OPGW.

Send the approved OPGW drawing and duty requirements