Guangzhou Fiber Optic Cable Manufacturer
Guangzhou Jiaxin Communication Optical Cable Co., Ltd.

Factory Background

Guangzhou Jiaxin Communication Optical Cable Co., Ltd.

Follow a project order from approved construction and sheath marking through optical inspection, numbered drums and pre-shipment release.

Jiaxin office reception

Company Information

Production Records That Follow the Project Order

Guangzhou Jiaxin Communication Optical Cable Co., Ltd. prepares cable orders from an approved technical file rather than relying on the model name alone. Route, fibre, structure, marking, drum and packing requirements are reviewed before release to production.

At the 16,600 m² Guangzhou base, process checks are selected for the construction being made. Finished optical results and measured lengths can be associated with drum and batch references used for shipment.

ISO certified management forms part of supplier review. Buyers can also define document, photo, video or third-party inspection requirements in the purchase order so evidence is prepared at the correct stage.

Project Delivery Heritage

Large-project experience since 2010

Major-project delivery requires technical confirmation, schedule control, coordinated production and a documented handover.

Historical participation is stated from factory project records. Supporting commercial or project documents may be reviewed where available and permitted.
2010

Guangzhou Asian Games project experience

According to factory project records, the factory participated in communications-cable related delivery supporting preparations for the 2010 Guangzhou Asian Games. The assigned scope was completed on schedule and received positive project feedback.

Since 2010

Continued engineering delivery

The team has continued supporting telecom backbone, FTTH access, power-corridor and protected industrial routes with project-specific cable construction.

Today

Evidence-led handover

Approved drawings, production checkpoints, optical test records, numbered drums, packing evidence and inspection access support procurement review.

Order Traceability

From Approved Drawing to Numbered Cable Drum

01

Approved order file

The production team works from the confirmed drawing, fibre specification, cable print, drum lengths and packing instructions.

02

In-process checkpoints

Critical dimensions and construction details are reviewed during tube, stranding, armouring and sheathing stages as applicable.

03

Finished-cable evidence

Optical results, measured length, appearance and drum identity are reconciled before the batch is released.

04

Inspection access

Buyers may request live video, document review or an independent pre-shipment inspection for the agreed checkpoints.

Product System

Factory Product Range for Project Orders

01

Order engineering review

Fibre count, construction, route, drum schedule, print and packing are converted into an approved production file.

02

Material and process control

Loose tubes, strength members, water blocking, armour and sheath are checked at the relevant production stages.

03

Drum-level traceability

Drum number, measured length, attenuation, continuity and visual inspection can be tied to the released batch.

04

Shipment handover

Labels, end protection, packing list, container plan and buyer-required photos are checked before dispatch.

Factory Videos

Production and Testing Videos

ALIBABA.COM

Alibaba.com Filmed Production and Quality Control

PRODUCTION

ADSS Optical Cable Manufacturing

TESTING

OTDR Testing and Inspection

CUSTOMIZATION

Custom Color Stripes on Fiber Optic Cable Jackets