Use the approved cable construction and section lengths as the production baseline.

UAE · Duct backbone
A manufacturing and documentation guide for duct and armored fiber cable orders delivered to UAE projects.
A duct cable order is not finished when production stops. Drum schedule, test records, labels, packing and shipment documents must all point to the same order. Jiaxin plans that handover from the approved specification onward.
Jiaxin PRODUCTION PLAN
Use the approved cable construction and section lengths as the production baseline.
Verify optical performance, dimensions, marking and length before packing.
Align packing list, drum numbers and inspection records for destination checks.
PLANNING INPUTS
FACTORY WORKFLOW

Materials and process settings follow the confirmed production sheet.

Optical and dimensional checks are recorded against the inspection plan.

Drums and packing references support warehouse and destination checks.
BILL OF MATERIALS
PRODUCTION FAQ
They affect drum planning, waste and field joint locations.
Yes, when included in the agreed inspection and packing workflow.
No. Buyer specifications and authority requirements always control the final order.